Skip to main content

Abramson Café
Windward provided MEP, fire protection, lighting, and low voltage services associated with the renovation of approximately 9,000 GSF. The project includes the complete renovation of the existing café.

Central Sterile Processing
Windward provided telecom and security engineering services for the design, engineering, and construction administration of the Central Sterile Processing and Materials Distribution renovation that consists of 22,000 SF of space on the A-Level of the Main Hospital.

Epilepsy Monitoring Unit
Windward was responsible for the voice, data, nurse call, PA, physiological and epileptic monitoring cabling infrastructure design for a 24-bed renovation to the seizure monitoring ward at the Children’s Hospital of Philadelphia. The project consisted renovation of the entire ninth floor of the Hospital’s South Tower.

PICU Renovation
Windward was responsible for low-voltage design services for the renovation of the Pediatric Intensive Care Unit.

NICU Expansion
Windward provided the design of low voltage systems associated with the renovation of approximately 24,000 GSF. The project includes the addition of 24 NICU beds and support space. It also relocates the Hope Auditorium on Level 2 Northeast.

Main Hospital BMT Renovation
Windward provided low voltage design services (nurse call, CATV, audio/visual for standard conference rooms, voice/data, patient monitoring, overhead paging, and security systems) for the renovation of the 15,000 SF Main Hospital BMT Renovation.

4th Floor Operating Rooms Renovations
Windward provided telecom engineering design services of low voltage systems for the 4th Floor Operating Room upgrades.

Where we are

CONNECT WITH US

View all locations Contact Us