Recognized for academic excellence, Girard Academic Music Program (GAMP) serves students from grades 5-12 to pursue music as a major subject. As part of the school’s improvements program, Windward provided M/E/P engineering design upgrades to the existing 46,700 SF building with an addition of 24,000 SF. The addition to the building consisted of a performance arts space, a gymnasium, a cafeteria with a full-service kitchen, and an elevator.
The renovation work included replacing steam boilers, piping, and controls for new and existing equipment. It included replacing all the water piping and adding ADA fixtures. The electrical work included replacing the primary and secondary service and electrical distribution and both fire alarm and fire protection were added.